How we
run a job.
The sequence a job follows from the drawing set to closeout, and how you hear from us while we are on it.
The sequence
Drawings first, inspection once
- 01
Drawings before pricing
We read the set, run the takeoff, and flag conflicts before a number goes out. A quote from a drawing we have not read is worth nothing to either of us.
- 02
Scope in writing
Inclusions, exclusions, shutdown windows, and the utility and permit responsibilities, stated before mobilization.
- 03
On the schedule
We show up on the date the schedule says. Long-lead items are ordered against your schedule, not ours.
- 04
Inspections met
Permit pulled, inspection called and attended by us. A failed final costs everyone two weeks.
- 05
Closeout
As-built panel schedules, labeled circuits, completion certificate, and the sticker in the panel door.
While we are on site
How you hear from us
The paperwork that keeps a job moving, on a rhythm you can plan around.
As they come up
RFIs
Raised in writing as soon as we find a conflict in the drawings — at takeoff where we can, not on the day of the pull.
Before ordering
Submittals
Product data and cut sheets go to you for approval before long-lead gear is released.
Before the work
Change orders
Extra work is priced in writing and approved before it starts. No surprise line items at closeout.
Every week
Progress note
A short written note: what was done, what is next, and anything waiting on a decision from you.
Start to finish
One foreman
One foreman runs the job and answers on the number you already have.
Terms on every job
- Quote validity
- 30 days, in writing
- Workmanship warranty
- 2 years, certificate at handover
- Shop hours
- Mon–Fri, 7 am–5 pm
- References
- Written, for comparable work, with the quote
Prequal paperwork — COI, W-9, license verification, safety and bonding — lives on one page.
Credentials and documentsGet the scope priced
Send the drawings, the scope, or the problem. Here is what happens next.
- We read the setWe read the drawings and the scope before we price anything.
- Written proposalInclusions, exclusions and shutdown windows stated up front.
- Scheduled around youOne foreman, weekly progress notes, change orders priced first.
Send a scope
Takes about 30 seconds. We reply the same business day, Mon–Fri, 7 am–5 pm. Sent after hours? Expect us the next business morning.
Thanks. Your scope is in.
We reply the same business day, Mon–Fri, 7 am–5 pm. Sent after hours? Expect us the next business morning.
- We read the scope and the drawings.
- We walk the site if needed and price it in writing.
- We schedule the shutdown around your operation.